Alerts
  • 07/16/24: We are aware of the smishing scams regarding outstanding toll charges. The Mobility Authority will never ask for personal information via text and only send texts with account updates and to those who have opted in to QR Code Digital Billing and Electronic Invoices. Please do not click on links or respond to any suspicious messages. To get the most up to date information about your Mobility Authority account, visit PayMobilityBill.com or call us at (833) 762-8655. The Mobility Authority works diligently to protect our customers’ data.

183 Toll

An 8-mile toll road along US 183 from US 290 to SH 71 in east Austin

Those looking to bypass traffic congestion have a choice to use 183 Toll. Drivers who prefer not to pay a toll can use the improved non-tolled general-purpose lanes of US 183.

Map highlighting the 183 Toll road
The 183 Toll project upgraded the previous four-lane US 183 to include three tolled mainlanes and up to three non-tolled general-purpose lanes in each direction between US 290 and SH 71—tripling the roadway’s previous capacity. The 183 Toll Road, combined with other roadways, makes it possible for drivers to travel from Austin-Bergstrom International Airport through Leander without stopping. 183 Toll also provides a north-south alternative to I-35.

Use Your Electronic Tag or Drive on Through, We’ll Bill You

183 Toll is completely automated with no need to stop or even slow down at toll booths.

The choice is yours – utilize the all-electronic, or cashless, method of toll payment through an electronic tag account; or if you don’t have an electronic tag just keep moving, and we’ll bill you through the Pay By Mail program.

In Texas, there are multiple transportation agencies that are authorized to operate toll roads and do their own billing. In the Austin area, there are two: the Texas Department of Transportation (TxDOT/TxTag) and the Central Texas Regional Mobility Authority (Mobility Authority).

Mobility Authority customers can pay their tolls with a TxTAG, TollTagEZ TAG, K-TAG, PikepassSunPass, E-470’s ExpressToll or Bancpass and get a 33% discount, or they can choose to Pay By Mail. Pay By Mail customers are billed using a picture of their license plate, and are charged a $1.00 statement fee per bill. Vehicle registration information must be up to date in order for the bill to be sent to the correct address. Pay By Mail is available on all toll roads in Central Texas, although you may receive separate bills depending on which agency operates the road you traveled on.

To learn about paying your tolls, see the download available below.

Paying My Mobility Authority Toll

183 Toll: 2024 Rates

Scroll to see more
2 Axle 3 Axle 4 Axle 5 Axle 6 Axle
TxTag Pay by Mail TxTag Pay by Mail TxTag Pay by Mail TxTag Pay by Mail TxTag Pay by Mail
51st Street SB Exit Ramp $0.79 $1.19 $1.58 $2.38 $2.37 $3.57 $3.16 $4.76 $3.95 $5.95
MLK Jr. Blvd. SB Mainline $1.46 $2.19 $2.92 $4.38 $4.38 $6.57 $5.84 $8.76 $7.30 $10.95
51st Street NB Entry Ramp $0.79 $1.19 $1.58 $2.38 $2.37 $3.57 $3.16 $4.76 $3.95 $5.95
51st Street NB Mainline $1.46 $2.19 $2.92 $4.38 $4.38 $6.57 $5.84 $8.76 $7.30 $10.95
MLK Blvd. NB Exit Ramp $1.06 $1.59 $2.12 $3.18 $3.18 $4.77 $4.24 $6.36 $5.30 $7.95
Smith Road SB Entry Ramp $0.69 $1.04 $1.38 $2.08 $2.07 $3.12 $2.76 $4.16 $3.45 $5.20
Smith Road NB Exit Ramp $0.69 $1.04 $1.38 $2.08 $2.07 $3.12 $2.76 $4.16 $3.45 $5.20
Thompson Lane Plaza $1.27 $1.91 $2.54 $3.82 $3.81 $5.73 $5.08 $7.64 $6.35 $9.55
SH 71 Direct Connector $0.69 $1.04 $1.38 $2.08 $2.07 $3.12 $2.76 $4.16 $3.45 $5.20
183 Toll Final Configuration Map

About the 183 Toll

Want more information fast? Download the fact sheet below on 183 Toll.

183 Toll Fact Sheet

Project History: The US 183 corridor from US 290 to SH 71 is one of Austin’s most important arterials. Originally constructed in the mid-1960’s, the divided highway had seen only minor improvements before the 183 South Project. As the primary route to and from the Austin-Bergstrom International Airport and points beyond, it attracted more than 60,000 vehicles per day. It had long been identified as a heavily contested corridor in need of improvement and was included in the Capital Area Metropolitan Planning Organization’s (CAMPO) Long Range Transportation Plan since July 2004.

Beginning in 2011, the Mobility Authority and the Texas Department of Transportation (TxDOT) worked with agencies and the community to develop a reasonable and feasible approach to improving mobility in the corridor to reduce travel times and improve quality of life.

The 183 South Project broke ground in April 2016 and opened in phases with the north end opening in August 2019, and the south end opening in early 2021.

Bicycle & Pedestrian Facilities. The 183 Trail is a 10-foot-wide shared use path adjacent to 183 Toll from US 290 to SH 71. This bicycle and pedestrian route will include pedestrian bridges crossing the highway at Springdale/Manor Road, 51st Street, and Bolm Road. It will also include connections to other regional trails such as the 290 Trail, the Walnut Creek Trail, the Lance Armstrong Bikeway, and the 71 Trail, and trailheads at 51st Street and Levander Loop.

Landscaping & Aesthetic Enhancements. The 183 South Project team incorporated a comprehensive approach to design known as Context Sensitive Solutions (CSS) to create a safe, efficient and environmentally responsible transportation corridor appropriate for its setting that speaks to the needs and values of the surrounding community. As part of the environmental study phase, the Mobility Authority and the Texas Department of Transportation conducted a 16-month CSS planning and public input process that resulted in the design aspects of the 183 South Project that were constructed. This approach allowed for public input to influence the final design such that it reflects the community’s cultural and historic values and aesthetic preferences. The process yielded three priorities described below:

Enhanced Landscape
The community identified enhanced landscape as the primary feature of the CSS design. Special neighborhood-specific tree species were planted to provide a unique focal point for neighborhood entrances along the corridor. Enhanced landscape consists of native, drought resistant plants that reduces water consumption and helps control soil erosion along US 183.

Community Connections
Community connections highlights how the roadway can “knit the community together” by focusing on trailheads, roadway crossings, and intersection improvements for pedestrians. This concept includes wayfinding signs, exercise areas near existing trails, as well as enhanced lighting, shade, and seating along the shared use path.

Regional Identity
Regional identity emphasizes bridge and wall design to promote a strong identity along the corridor. This concept includes the use of unique and attractive design elements for various structures like bridges and retaining walls.

Large Oak Trees
Through community outreach and throughout the CSS Process, we learned that protection of large oak trees within the project corridor was important to the community. The Mobility Authority incentivized the project team to protect and preserve the large live oak trees located within the project limits, just south of Montopolis Drive near Callahan’s General Store. Tree preservation groups and representatives from the City of Austin, the Texas Department of Transportation, and additional stakeholder groups outlined a comprehensive set of Best Management Practices (BMPs) to protect the trees before and during construction.

Images

Sign Up for the CTRMA Newsletter